Help centreBackup source and hybrid
Technical page

Backup power and
hybrid operation

Declaring a second power source, then checking what the study adds to the equipment and to the diagram.

When is a backup source declared?

The option is ticked at step 6 when a grid connection or a generator must be able to supply the pump. The option asks for neither brand nor power: LE LAB selects a compatible solution and states the resulting architecture in the diagram.

The backup source must not be declared solely to improve solar coverage artificially. It corresponds to a source genuinely planned on the installation.

What the selection changes

  • Addition of the cabinet or of the pairing device suited to the range.
  • Exclusion of pumps that cannot run with a second source.
  • Addition of the backup source and of its description in the diagram.
Card at step six allowing another power source to be declared as a backup.

Reading the diagram

The legend states the type of operation selected for the solution:

  • Automatic switchover: one source supplies the pump at a time.
  • Automatic blending: both sources can contribute at the same time.

The behaviour depends on the pump and on the control equipment selected. It cannot be deduced from the presence of the backup source alone.

Diagram of a hybrid installation where the backup source appears in the numbered legend.

Generator power

When a minimum power is published, it appears in the backup line of the diagram. In constant pressure, it is also repeated in a tile and may be qualified “at continuous load”.

The exact wording of the study is the one to keep. A value in kW is not directly comparable with a commercial rating plate expressed in kVA without checking the characteristics of the generator.

To be confirmed before site work. Voltage, frequency, available power, duty rating and compatibility with the cabinet still have to be compared with the equipment documents.
Legend line stating a grid or generator backup with automatic switchover and a minimum power.